Tabel Alokasi Anggaran Pendapatan Pada APBD KOTA GUNUNG SITOLI | |||
Pendapatan Asli daerah (PAD) | Rp 34.170.472.155 | 4.7 % | |
Transfer | Dana Bagi Hasil (DBH) | Rp 16.172.212.000 | 2.2 % |
Transfer | Dana Alokasi Umum (DAU) | Rp 399.419.428.000 | 55.1 % |
Transfer | Dana Alokasi Khusus (DAK) Fisik | Rp 43.076.695.000 | 5.9 % |
Transfer | Dana Alokasi Khusus (DAK) Non Fisik | Rp 78.279.936.000 | 10.8 % |
Transfer | Dana Insentif Daerah (DID) | Rp 8.511.835.000 | 1.2 % |
Transfer | Dana Desa | Rp 80.675.367.000 | 11.1 % |
Lain Lain Pendapatan Daerah yang Sah | Rp 18.189.506.629 | 2.5 % |
No. | Uraian | Anggaran (Rp.) |
TRIWULAN I | Keterangan | |||||
Januari | Februari | Maret | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 724.364.631.368 | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |
2 | Capaian | Rp 142.121.252.040 | Rp 0 | 0 | Rp 0 | 20.6 | Rp 142.121.252.040 | 20.6 | |
Deviasi | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN II | Keterangan | |||||
April | Mei | Juni | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 689.277.003.045 | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |
2 | Capaian | Rp 288.719.267.557 | Rp 187.947.081.450 | 27.3 | Rp 228.058.196.649 | 33.1 | Rp 288.719.267.557 | 41.9 | |
Deviasi | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN III | Keterangan | |||||
Juli | Agustus | September | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 689.277.003.045 | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |
2 | Capaian | Rp 511.665.074.476 | Rp 357.510.697.748 | 51.9 | Rp 357.510.697.748 | 51.9 | Rp 511.665.074.476 | 74.2 | |
Deviasi | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN IV | Keterangan | |||||
Oktober | November | Desember | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 724.364.631.368 | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |
2 | Capaian | Rp 710.592.230.742 | Rp 534.010.355.604 | 73.7 | Rp 627.360.287.630 | 86.6 | Rp 710.592.230.742 | 98.1 | |
Deviasi | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 |
Tabel Alokasi Anggaran Belanja Pada APBD KOTA GUNUNG SITOLI | |||
Belanja Operasi | Rp 466.672.742.416 | 61.21 % | |
Belanja Modal | Rp 168.345.774.415 | 22.08 % | |
Belanja Tak Terduga | Rp 1.481.900.000 | 0.19 % | |
Belanja Transfer | Rp 125.871.372.091 | 16.51 % | |
Alokasi Anggaran Belanja Pada APBD KOTA GUNUNG SITOLI Rp 762.371.788.922 |
No. | Uraian | Anggaran (Rp.) |
TRIWULAN I | Keterangan | |||||
Januari | Februari | Maret | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 717.263.545.538 | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |
2 | Capaian | Rp 88.722.522.600 | Rp 0 | 0 | Rp 0 | 0 | Rp 88.722.522.600 | 12.4 | |
Deviasi | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN II | Keterangan | |||||
April | Mei | Juni | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 717.263.545.538 | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |
2 | Capaian | Rp 238.880.030.152 | Rp 131.226.980.672 | 18.3 | Rp 172.438.901.989 | 24 | Rp 238.880.030.152 | 33.3 | |
Deviasi | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN III | Keterangan | |||||
Juli | Agustus | September | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 717.263.545.538 | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |
2 | Capaian | Rp 454.303.715.535 | Rp 329.403.341.984 | 45.9 | Rp 329.403.341.984 | 45.9 | Rp 454.303.715.535 | 63.3 | |
Deviasi | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN IV | Keterangan | |||||
Oktober | November | Desember | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 762.371.788.922 | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 | |
2 | Capaian | Rp 696.581.644.851 | Rp 501.886.320.331 | 65.8 | Rp 555.056.574.340 | 72.8 | Rp 696.581.644.851 | 91.4 | |
Deviasi | Rp 0 | 0 | Rp 0 | 0 | Rp 0 | 0 |
Mandatory Spending | Aturan UU | APBD | Anggaran |
Pendidikan | 20 % | 24 % | Rp 172.369.401.221 |
Kesehatan | 10 % | 15 % | Rp 70.822.965.766 |
Infrastruktur Daerah | 25 % | 68.61 % | Rp 255.920.548.485 |
Dana Desa | 10 % | 20.93 % | Rp 89.308.308.000 |
Mandatory Spending | Aturan UU | P APBD | Anggaran |
Pendidikan | 20 % | 24 % | Rp 70.822.965.766 |
Kesehatan | 10 % | 15 % | Rp 70.822.965.766 |
Infrastruktur Daerah | 25 % | 68.61 % | Rp 70.822.965.766 |
Dana Desa | 10 % | 20.93 % | Rp 89.308.308.000 |
Anggaran | Dana Desa Kota Gunung Sitoli Periode 27 Desember 2022 | Realisasi Dana Desa | ||||||
---|---|---|---|---|---|---|---|---|
Tahap 1 | Tahap 2 | Tahap 3 | 44.738.918.439,00 | |||||
80.675.367.000,00 | 18.036.794.640,00 | 17.875.479.079,00 | 8.826.644.720,00 | 55.46 % | ||||
Desa Cair : 98 | Belum Cair : 0 | Desa Cair : 98 | Belum Cair : 0 | Desa Cair : 97 | Belum Cair : 1 |
Realisasi Dana BLT Kota Gunung Sitoli Periode 27 Desember 2022 : 28.612.800.000,00 | Total Penyaluran | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
TW 1 | TW 2 | TW 3 | TW 4 | Realokasi | 80.322.298.839,00 | |||||
7.153.200.000,00 | 7.153.200.000,00 | 7.153.200.000,00 | 7.153.200.000,00 | 6.970.580.400,00 | 99.56 % | |||||
Desa Cair : 98 | Belum Cair : 0 | Desa Cair : 98 | Belum Cair : 0 | Desa Cair : 98 | Belum Cair : 0 | Desa Cair : 98 | Belum Cair : 0 |