Tabel Alokasi Anggaran Pendapatan Pada APBD KABUPATEN HUMBANG HASUNDUTAN | |||
Pendapatan Asli daerah (PAD) | Rp 82.853.322.600 | 8 % | |
Transfer | Dana Bagi Hasil (DBH) | Rp 16.678.060.000 | 1.6 % |
Transfer | Dana Alokasi Umum (DAU) | Rp 522.561.237.000 | 50.6 % |
Transfer | Dana Alokasi Khusus (DAK) Fisik | Rp 82.871.854.000 | 8 % |
Transfer | Dana Alokasi Khusus (DAK) Non Fisik | Rp 129.123.868.692 | 12.5 % |
Transfer | Dana Insentif Daerah (DID) | Rp 14.782.971.000 | 1.4 % |
Transfer | Dana Desa | Rp 128.998.873.000 | 12.5 % |
Lain Lain Pendapatan Daerah yang Sah | Rp 10.120.040.000 | 1 % |
No. | Uraian | Anggaran (Rp.) |
TRIWULAN I | Keterangan | |||||
Januari | Februari | Maret | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.033.577.144.507 | Rp 109.847.705.854 | 10.8 | Rp 194.623.222.511 | 19.1 | Rp 279.416.750.518 | 27.4 | |
2 | Capaian | Rp 172.915.490.600 | Rp 34.070.813.850 | 3.3 | Rp 99.465.374.967 | 17 | Rp 172.915.490.600 | 17 | |
Deviasi | Rp 75.776.892.004 | 7.5 | Rp 95.157.847.544 | 9.3 | Rp 106.501.259.918 | 10.4 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN II | Keterangan | |||||
April | Mei | Juni | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.019.790.069.081 | Rp 364.290.730.550 | 35.7 | Rp 449.086.247.207 | 44 | Rp 534.403.059.284 | 52.4 | |
2 | Capaian | Rp 368.653.410.349 | Rp 211.646.721.560 | 20.8 | Rp 266.549.416.870 | 26.1 | Rp 368.653.410.349 | 36.1 | |
Deviasi | Rp 152.644.008.990 | 14.9 | Rp 182.536.830.337 | 17.9 | Rp 165.749.648.935 | 16.3 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN III | Keterangan | |||||
Juli | Agustus | September | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.019.790.069.081 | Rp 619.221.979.316 | 60.7 | Rp 704.077.555.973 | 69 | Rp 788.894.777.785 | 77.4 | |
2 | Capaian | Rp 642.637.286.506 | Rp 522.317.125.632 | 51.2 | Rp 548.506.371.466 | 53.8 | Rp 642.637.286.506 | 63 | |
Deviasi | Rp 96.904.853.684 | 9.5 | Rp 155.571.184.507 | 15.2 | Rp 146.257.491.279 | 14.4 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN IV | Keterangan | |||||
Oktober | November | Desember | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.033.577.144.507 | Rp 873.764.367.443 | 84.5 | Rp 960.034.884.101 | 92.9 | Rp 1.033.577.144.507 | 100 | |
2 | Capaian | Rp 1.005.962.395.135 | Rp 874.696.278.839 | 84.6 | Rp 901.475.619.463 | 87.2 | Rp 1.005.962.395.135 | 97.3 | |
Deviasi | Rp 0 | 0 | Rp 58.559.264.638 | 5.7 | Rp 27.614.749.372 | 2.7 |
Tabel Alokasi Anggaran Belanja Pada APBD KABUPATEN HUMBANG HASUNDUTAN | |||
Belanja Operasi | Rp 752.331.947.532 | 69.75 % | |
Belanja Modal | Rp 141.684.105.322 | 13.14 % | |
Belanja Tak Terduga | Rp 1.668.992.000 | 0.15 % | |
Belanja Transfer | Rp 182.919.268.100 | 16.96 % | |
Alokasi Anggaran Belanja Pada APBD KABUPATEN HUMBANG HASUNDUTAN Rp 1.078.604.312.954 |
No. | Uraian | Anggaran (Rp.) |
TRIWULAN I | Keterangan | |||||
Januari | Februari | Maret | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.044.846.285.278 | Rp 97.098.829.129 | 9.3 | Rp 141.038.746.183 | 13.5 | Rp 305.791.011.217 | 29.3 | |
2 | Capaian | Rp 97.857.624.454 | Rp 15.258.987.200 | 1.5 | Rp 40.356.000.041 | 3.9 | Rp 97.857.624.454 | 9.4 | |
Deviasi | Rp 81.839.841.929 | 7.8 | Rp 100.682.746.142 | 9.6 | Rp 207.933.386.763 | 19.9 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN II | Keterangan | |||||
April | Mei | Juni | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.044.846.285.278 | Rp 373.206.100.689 | 35.7 | Rp 430.329.368.028 | 41.2 | Rp 552.718.274.509 | 52.9 | |
2 | Capaian | Rp 336.142.465.641 | Rp 154.494.823.852 | 14.8 | Rp 234.897.908.438 | 22.5 | Rp 336.142.465.641 | 32.2 | |
Deviasi | Rp 218.711.276.837 | 20.9 | Rp 195.431.459.590 | 18.7 | Rp 216.575.808.868 | 20.7 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN III | Keterangan | |||||
Juli | Agustus | September | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.044.846.285.278 | Rp 671.376.980.330 | 64.3 | Rp 737.117.428.130 | 70.5 | Rp 843.434.645.915 | 80.7 | |
2 | Capaian | Rp 577.764.895.545 | Rp 434.891.857.434 | 41.6 | Rp 517.006.407.198 | 49.5 | Rp 577.764.895.545 | 55.3 | |
Deviasi | Rp 236.485.122.896 | 22.7 | Rp 220.111.020.932 | 21 | Rp 265.669.750.370 | 25.4 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN IV | Keterangan | |||||
Oktober | November | Desember | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.078.604.312.954 | Rp 916.177.851.906 | 84.9 | Rp 973.553.220.142 | 90.3 | Rp 1.078.604.312.954 | 100 | |
2 | Capaian | Rp 1.018.955.758.458 | Rp 655.856.447.635 | 60.8 | Rp 801.797.594.654 | 74.3 | Rp 1.018.955.758.458 | 94.5 | |
Deviasi | Rp 260.321.404.271 | 24.1 | Rp 171.755.625.488 | 16 | Rp 59.648.554.496 | 5.5 |
Mandatory Spending | Aturan UU | APBD | Anggaran |
Pendidikan | 20 % | 30.72 % | Rp 320.997.690.045 |
Kesehatan | 10 % | 29.28 % | Rp 176.393.440.925 |
Infrastruktur Daerah | 25 % | 12.71 % | Rp 110.082.071.494 |
Dana Desa | 10 % | 24.42 % | Rp 124.934.505.000 |
Mandatory Spending | Aturan UU | P APBD | Anggaran |
Pendidikan | 20 % | 31.07 % | Rp 176.542.323.151 |
Kesehatan | 10 % | 27.75 % | Rp 176.542.323.151 |
Infrastruktur Daerah | 25 % | 14.57 % | Rp 176.542.323.151 |
Dana Desa | 10 % | 24.42 % | Rp 124.934.505.000 |
Anggaran | Dana Desa Kabupaten Humbang Hasundutan Periode 02 Desember 2024 | Realisasi Dana Desa | ||||||
---|---|---|---|---|---|---|---|---|
Tahap 1 | Tahap 2 | Tahap 3 | 0,00 | |||||
128.998.873.000,00 | 30.250.035.200,00 | 45.375.052.800,00 | 0,00 | 0 % | ||||
Desa Cair : 153 | Belum Cair : 0 | Desa Cair : 153 | Belum Cair : 153 | Desa Cair : 153 | Belum Cair : 0 |
Realisasi Dana BLT Kabupaten Humbang Hasundutan Periode 02 Desember 2024 : 0,00 | Total Penyaluran | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
TW 1 | TW 2 | TW 3 | TW 4 | Realokasi | 128.998.873.000,00 | |||||
29.448.264.000,00 | 19.632.176.000,00 | 0,00 | 0,00 | 0,00 | 100 % | |||||
Desa Cair : 153 | Belum Cair : 0 | Desa Cair : 0 | Belum Cair : 0 | Desa Cair : 153 | Belum Cair : 0 | Desa Cair : 0 | Belum Cair : 0 |