Tabel Alokasi Anggaran Pendapatan Pada APBD KABUPATEN HUMBANG HASUNDUTAN | |||
Pendapatan Asli daerah (PAD) | Rp 87.048.360.602 | 8.5 % | |
Transfer | Dana Bagi Hasil (DBH) | Rp 17.876.339.000 | 1.7 % |
Transfer | Dana Alokasi Umum (DAU) | Rp 498.857.539.000 | 48.8 % |
Transfer | Dana Alokasi Khusus (DAK) Fisik | Rp 89.227.291.350 | 8.7 % |
Transfer | Dana Alokasi Khusus (DAK) Non Fisik | Rp 126.638.469.962 | 12.4 % |
Transfer | Dana Insentif Daerah (DID) | Rp 10.591.152.000 | 1 % |
Transfer | Dana Desa | Rp 127.331.009.000 | 12.5 % |
Lain Lain Pendapatan Daerah yang Sah | Rp 22.933.859.000 | 2.2 % |
No. | Uraian | Anggaran (Rp.) |
TRIWULAN I | Keterangan | |||||
Januari | Februari | Maret | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.022.694.688.129 | Rp 84.577.348.184 | 8.3 | Rp 169.129.696.368 | 16.6 | Rp 253.715.595.813 | 24.9 | |
2 | Capaian | Rp 105.905.833.583 | Rp 64.836.043.130 | 6.4 | Rp 64.924.880.350 | 10.4 | Rp 105.905.833.583 | 10.4 | |
Deviasi | Rp 19.741.305.054 | 1.9 | Rp 104.204.816.018 | 10.2 | Rp 147.809.762.230 | 14.5 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN II | Keterangan | |||||
April | Mei | Juni | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.017.406.292.290 | Rp 338.311.197.497 | 33.3 | Rp 422.895.860.681 | 41.6 | Rp 508.043.266.217 | 49.9 | |
2 | Capaian | Rp 392.928.944.236 | Rp 106.992.174.871 | 10.5 | Rp 270.175.082.955 | 26.6 | Rp 392.928.944.236 | 38.6 | |
Deviasi | Rp 231.319.022.626 | 22.8 | Rp 152.720.777.726 | 15 | Rp 115.114.321.981 | 11.3 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN III | Keterangan | |||||
Juli | Agustus | September | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.017.406.292.290 | Rp 592.658.021.401 | 58.3 | Rp 677.269.109.585 | 66.6 | Rp 761.881.669.488 | 74.9 | |
2 | Capaian | Rp 569.509.462.149 | Rp 491.219.859.489 | 48.3 | Rp 535.477.312.086 | 52.6 | Rp 569.509.462.149 | 56 | |
Deviasi | Rp 101.438.161.912 | 10 | Rp 141.791.797.499 | 14 | Rp 192.372.207.339 | 18.9 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN IV | Keterangan | |||||
Oktober | November | Desember | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.022.694.688.129 | Rp 846.451.217.672 | 82.8 | Rp 932.677.515.856 | 91.2 | Rp 1.022.694.688.129 | 100 | |
2 | Capaian | Rp 948.781.719.680 | Rp 741.555.857.176 | 72.5 | Rp 760.949.900.657 | 74.4 | Rp 948.781.719.680 | 92.8 | |
Deviasi | Rp 104.895.360.496 | 10.3 | Rp 171.727.615.199 | 16.8 | Rp 73.912.968.449 | 7.2 |
Tabel Alokasi Anggaran Belanja Pada APBD KABUPATEN HUMBANG HASUNDUTAN | |||
Belanja Operasi | Rp 710.784.787.511 | 64.44 % | |
Belanja Modal | Rp 212.625.573.389 | 19.28 % | |
Belanja Tak Terduga | Rp 1.316.280.000 | 0.12 % | |
Belanja Transfer | Rp 178.341.712.600 | 16.17 % | |
Alokasi Anggaran Belanja Pada APBD KABUPATEN HUMBANG HASUNDUTAN Rp 1.103.068.353.500 |
No. | Uraian | Anggaran (Rp.) |
TRIWULAN I | Keterangan | |||||
Januari | Februari | Maret | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.071.686.699.958 | Rp 98.912.107.929 | 9.2 | Rp 153.663.991.074 | 14.3 | Rp 220.044.598.199 | 20.5 | |
2 | Capaian | Rp 93.114.728.077 | Rp 19.669.677.924 | 1.8 | Rp 40.078.146.278 | 3.7 | Rp 93.114.728.077 | 8.7 | |
Deviasi | Rp 79.242.430.005 | 7.4 | Rp 113.585.844.796 | 10.6 | Rp 126.929.870.122 | 11.8 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN II | Keterangan | |||||
April | Mei | Juni | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.071.686.699.958 | Rp 379.838.436.332 | 35.4 | Rp 463.811.489.777 | 43.3 | Rp 547.309.583.219 | 51.1 | |
2 | Capaian | Rp 351.324.990.416 | Rp 117.925.167.119 | 11 | Rp 248.995.819.653 | 23.2 | Rp 351.324.990.416 | 32.8 | |
Deviasi | Rp 261.913.269.213 | 24.4 | Rp 214.815.670.124 | 20.1 | Rp 195.984.592.803 | 18.3 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN III | Keterangan | |||||
Juli | Agustus | September | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.071.686.699.958 | Rp 675.905.511.799 | 63.1 | Rp 747.943.121.745 | 69.8 | Rp 844.276.371.017 | 78.8 | |
2 | Capaian | Rp 584.633.354.269 | Rp 432.771.627.605 | 40.4 | Rp 534.756.721.256 | 49.9 | Rp 584.633.354.269 | 54.6 | |
Deviasi | Rp 243.133.884.194 | 22.7 | Rp 213.186.400.489 | 19.9 | Rp 259.643.016.748 | 24.2 | |||
No. | Uraian | Anggaran (Rp.) |
TRIWULAN IV | Keterangan | |||||
Oktober | November | Desember | |||||||
(Rp.) | (%) | (Rp.) | (%) | (Rp.) | (%) | ||||
1 | Target | Rp 1.103.068.353.500 | Rp 948.161.542.848 | 86 | Rp 1.027.655.616.942 | 93.2 | Rp 1.103.068.353.500 | 100 | |
2 | Capaian | Rp 1.006.664.937.473 | Rp 671.083.275.852 | 60.8 | Rp 773.013.171.655 | 70.1 | Rp 1.006.664.937.473 | 91.3 | |
Deviasi | Rp 277.078.266.996 | 25.2 | Rp 254.642.445.287 | 23.1 | Rp 96.403.416.027 | 8.7 |
Mandatory Spending | Aturan UU | APBD | Anggaran |
Pendidikan | 20 % | 26.15 % | Rp 280.443.754.649 |
Kesehatan | 10 % | 20.42 % | Rp 178.065.197.888 |
Infrastruktur Daerah | 25 % | 23.21 % | Rp 210.869.710.750 |
Dana Desa | 10 % | 24.42 % | Rp 124.934.505.000 |
Anggaran | Dana Desa Kabupaten Humbang Hasundutan Periode 29 Desember 2023 | Realisasi Dana Desa | ||||||
---|---|---|---|---|---|---|---|---|
Tahap 1 | Tahap 2 | Tahap 3 | 108.141.307.000,00 | |||||
127.331.009.000,00 | 36.900.632.100,00 | 36.900.632.100,00 | 34.340.042.800,00 | 84.93 % | ||||
Desa Cair : 153 | Belum Cair : 0 | Desa Cair : 153 | Belum Cair : 0 | Desa Cair : 153 | Belum Cair : 0 |
Realisasi Dana BLT Kabupaten Humbang Hasundutan Periode 29 Desember 2023 : 14.860.800.000,00 | Total Penyaluran | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
TW 1 | TW 2 | TW 3 | TW 4 | Realokasi | 127.331.009.000,00 | |||||
3.715.200.000,00 | 3.715.200.000,00 | 3.715.200.000,00 | 3.715.200.000,00 | 4.328.902.000,00 | 100 % | |||||
Desa Cair : 153 | Belum Cair : 0 | Desa Cair : 153 | Belum Cair : 0 | Desa Cair : 153 | Belum Cair : 0 | Desa Cair : 153 | Belum Cair : 0 |